Unrestricted Report

ITEM NO:  05

Application No.

21/00250/OUT

Ward:

Wildridings And Central

Date Registered:

5 March 2021

Target Decision Date:

4 June 2021

Site Address:

Bracknell Town Football Club Larges Lane Bracknell Berkshire RG12 9AN

Proposal:

Outline application including access, appearance, layout and scale for demolition of existing dwelling and sports buildings and erection of 117 apartments with associated parking.

Applicant:

Bracknell Town Football Club

Agent:

Mr Matthew Miller

Case Officer:

Jo Male, 01344 352000

Development.control@bracknell-forest.gov.uk

 

Site Location Plan  (for identification purposes only, not to scale)

 



1.         SUMMARY

 

1.1     As originally submitted, this application sought outline planning permission for the                    erection of 126 residential apartments in three detached blocks following the                             demolition of the existing buildings accessed off Larges Lane. The application was                  presented to an Advisory Meeting of the Planning Committee on 24th March 2022                   at which a motion to endorse the recommendation in the officer report to approve                         the application was proposed but fell at the vote. The application has since been                             revised to reduce the number of proposed units to 117 and to provide 3 car club                         parking spaces and additional EV charging infrastructure.

 

1.2     The application proposes the development of land allocated for housing under                          Policy SA2 of the Site Allocation Local Plan SALP for approximately 102 dwellings.

 

1.3     The site lies within the defined settlement boundary of Bracknell.  It is in a                                 sustainable location close to the town centre and public transport and as such is                      considered a suitable location for new residential development.  Notwithstanding                     the above, the applicant is required to demonstrate that appropriate replacement                           playing field provision has been secured to the satisfaction of the Council and                            Sport England, prior to the grant of any planning permission for the development of              the Larges Lane site. On balance, and taking into consideration the views of Sport                 England, it is considered that the package of mitigation measures already                                     approved and largely implemented by the applicant is sufficient to demonstrate this           subject to the completion of the permitted enhancement measures at Sandhurst                      Memorial Park and conditions securing this mitigation for the long term.

 

1.4     Previous concerns in respect of the scale, massing, design, appearance, impact                      on the amenities of neighbouring properties and transport are now considered to                          have been satisfactorily addressed.  It is considered that an attractive and well-                       designed development with a high-quality landscaping scheme could be achieved.

 

1.5     The recent amendments to the scheme, reducing the number of proposed units                       and providing 3no. car club spaces improves the parking provision to serve the                      development. The proposal is considered to provide adequate parking to serve the                   proposed use and would not result in any significant highway safety implications.

 

1.6     It is therefore considered that the proposed development would have an                                    acceptable impact on the character and appearance of the area, on the amenity of                   neighbouring properties and on transport, subject to appropriate conditions and a                     completed S106 agreement. Approval is therefore recommended.

 

 

RECOMMENDATION

Planning permission be granted subject to completion of a S106 legal agreement   and the conditions in Section 11 of this report

 

 

 

2.         REASON FOR REPORTING APPLICATION TO COMMITTEE

`                                                                                   

2.1      The application has been reported to the Advisory Planning Committee following                     the receipt        of more than 5 objections.

 

 

 

3.         PLANNING STATUS AND SITE DESCRIPTION

 

PLANNING STATUS

Within defined settlement and allocated for housing under SALP Policy SA2

Located within 5km of Thames Basin Heaths SPA

 

3.1      The 1.16ha application site is a roughly rectangular parcel of land comprising a                        football pitch with associated spectator and club facilities – including spectator                         stands, a car park, and a clubhouse. In addition the site contains a single dwelling.

 

3.2      The site takes access from Larges Lane to the east. It is bounded to the north by                     Bracknell Cricket Club, and to the west, south and east by residential properties.                      These include flatted developments up to four stories in height to the west and south-               west; a two-storey detached house adjoining the southern boundary and a recent             development of three storey town houses and a small apartment block on the                         eastern boundary.

 

3.3      The site is located in a mixed-use area, including various sports facilities, religious,                  education and health uses in addition to residential properties.

 

3.4      Although the sports pitch itself is level, this is raised above surrounding ground levels              at the north and east of the site where the ground slopes steeply down to adjacent             properties on Robins Gate and Larges Lane and retaining walls are required to step             down from the level of the pitch.  There is a 6.3m level difference between the west               of the site and Larges Lane on the east.

 

4.         RELEVANT SITE HISTORY

 

4.1     The application site contains an extensive planning history, dating back

          to 1962. The most relevant recent planning applications are listed below.

 

          20/00350/OUT - Demolition of existing dwelling and sports buildings. Erection of                      164 apartments (80 x 1 Bedroom, 80 x 2 Bedroom and 4 x 3 Bedroom) and                           associated access and parking.  Withdrawn 11.09.2020

 

          19/00400/FUL – Section 73 application for variation to planning permission                               16/00116/FUL for the "Refurbishment of existing football ground including                                relocating and installation of new artificial football pitch (3G pitch) and                                     rebuilding/upgrading of existing stands and associated facilities”.  Approved                    28.05.2020.

 

          17/00384/FUL - Erection of single storey extension to existing clubhouse and                           change of use to mixed use for club office and residential flat. Approval 05.03.2019

 

          16/00738/FUL – Section 73 application for variation to planning permission                               16/00116/FUL for the refurbishment of existing football ground including relocating                  and installation of new artificial football pitch (3G pitch) and rebuilding/upgrading of               existing stands and associated facilities.  Approved 31.10.2016.

 

          16/00116/FUL - Refurbishment of existing football ground including relocating and                   installation of new artificial football pitch (3G pitch) and rebuilding/upgrading of                         existing stands and associated facilities. Approval 16.05.2016

 

 

 

5.       THE PROPOSAL

 

5.1      Planning permission is sought for the erection of 117 residential apartments (14 x                    1 bed, 89 x 2 bed, 14 x 3 bed) in three detached blocks following the demolition of            the existing buildings.  This is an outline application but all matters other than                          landscaping are to be considered at the outline stage.

 

5.2      The three blocks would be grouped around a central communal amenity space at           the heart of the development.  They would vary in height from two to five stories                             with setback top floors.  The proposed materials include a buff brick to the main                      façade with a dark grey brick plinth which would also be used for the recessed                         cores, and some vertical elements in the facades.  Light cladding materials are                        proposed on the upper floors where the accommodation steps back from the main                facade. Full details of the materials can be secured through an appropriate                                      condition.

 

5.3      The proposal also includes associated access and parking. Vehicular and                                 pedestrian access would be from the existing single access on Larges Lane.  This                   access would be improved and would incorporate a new access for the cricket club           off the new access road into the site. A total of 167 car parking spaces would be                     provided, via a mix of exterior parking courts and an undercroft car park on the                      western part of the site.

 

5.4      The development would comprise 25% affordable housing. 

 

5.5      The proposal would also require considerable changes to the existing levels with                      ground levels being generally lowered where there are retaining walls supporting the               existing artificially raised playing field, and more gradual slopes across the site would                  be re-introduced.  These level changes would also be utilised to create the                                undercroft car park under block B and a podium level amenity area.  While full details            of landscaping are reserved, outdoor soft landscaping areas would be provided                         through various amenity areas on the boundaries of the site as well as the centrally             located podium level amenity area above the undercroft car park.

 

5.6      In response to feedback received from the previous application submission, pre-                      application feedback and community engagement the proposal was revised and as                 originally submitted proposed 126 units, a reduction of some 38 units when                                    compared with the previously withdrawn application 20/00350/OUT. Detailed                     changes to parking & access arrangements, as well as proposed indicative                               landscaping features, have also been undertaken.

 

5.7      Following neighbour comments, the scheme was amended in April 2021 by the                        removal of balcony sections from the east-facing elevation of Building A to ensure                   that no harmful loss of privacy or overlooking impacts would occur to the                                     neighbouring residents of Robins Gate to the east.  Further amendments were made                  in January 2022 in response to comments from the Highway Officer.

 

5.8     Further to the consideration of the application by the Advisory Meeting of the                            Planning Committee in March 2022 at which a motion to endorse the                                         recommendation in the officer report to approve the application was proposed but                    fell at the vote, further amendments have been made. These reduce the number of              proposed units to 117, a reduction of 9 units, achieved through the removal of the             third floor of accommodation provided within Block C; the provision of 3 car club                             parking spaces, and the provision of additional EV charging throughout the site.

 

 

6.       REPRESENTATIONS RECEIVED

 

          Bracknell Town Council

 

          In response to the original 126 unit scheme, the Town Council commented:

          ‘At this point in the planning process with a reduced amount of dwellings and more                   parking facilities Bracknell Town Councillors have no objection’.

 

          The Town Council has been notified of the recent amendments to the scheme and                  any additional comments will be reported to the Committee via the Supplementary                Report.

 

          Other representations received

 

          A petition has been received containing 16 signatures.  It raises the following                            objections:

 

          - Site is already over-developed and the scale of the application is not in keeping                     with the character and size of the development site and surrounding buildings.

          - Risk to highway safety and traffic generation will create pollution, parking pressures              and noise detrimental to all local residents in Larges Lane, the roads leading off it                  and surrounding neighbours.

          - The layout and density of the proposed buildings will block natural light to existing                  buildings, overlook other properties and diminish privacy.

 

          44 objections have been received from neighbouring properties.  In addition, 22                        representations in support of the application have been received.

 

          The concerns raised can be summarised as follows:

 

          Loss of Open space

          - The area is rapidly becoming a concrete jungle and the proposed development                      would destroy one of the few remaining green spaces in the area.

 

          - There are not enough facilities for children to play football throughout the winter                     months. This is such a waste of a fantastic opportunity to encourage children's                         fitness and social interactions. 

 

          - If we continue to replace all open spaces and leisure places with yet more housing,               where are future generations going to play and social sports and recreation                              programs going to run from?

 

          Impact on residential amenity

          -  views and sunlight will be lost to properties in Robins Gate.

 

          - Building A east elevation's redesign has not removed the overlooking and loss of                   privacy for the 4 houses in Robins Gate, as the 4 balconies on the north eastern                      apartments have a direct line of vision into the gardens and the bedrooms of the 4                   houses. There will still be associated shading and loss of daylight, during late                     afternoon and early evening when the sun would be blocked by Building A.

 

          - Noise and disturbance from traffic using the new access road behind properties on                Robins Gate

 

          - This proposal will cause extreme stress on the residents of Huntsgreen Court. The                height of the flats will overlook our properties, with balconies overlooking our                            gardens, and blocking light, also causing our flats to lose value

 

          - Noise, dust and vibration during construction

 

          Highway issues

          - Revised application does not make any significant change to the access                                 arrangements and car parking volume requirements. Reducing parking below the           full standard will only result in an overspill onto Larges Lane which is already at                      capacity and has width restrictions and needs to allow access for school traffic at                     the same time as the peak traffic is expected. What is the point of having a “standard”              if it is not met? As a minimum they would need 180.5 spaces. With only 28 visitor                     bays for 126 flats, there is no way of guaranteeing only a quarter of the flats will have               a visitor at any one time.

 

          -  Concern about increase in vehicular traffic and parking problems on Larges Lane.                The safety of egress from Larges Lane at the junction with London Road must be                  reviewed using accurate vehicle movement data for the entire Larges Lane area                            including all residential housing, St Joseph's Primary School and Football Academy                traffic, as the vehicle movement data used for the Transport Assessment is incorrect                   and incomplete.

 

          - Parking is already a nightmare for dropping/collecting from school and we are                        currently allowed to make use of the football car park for parking

 

          Environment issues

          - Detrimental to the town’s air quality targets, as is so close to highly polluted areas,                 Downshire way and Bagshot Road which were recent areas of significant nitrogen                   dioxide pollution concern and this is in the immediate nearby area impacting health.

 

          Character and Design issues

          - development is totally out of keeping with the present properties and should not be                permitted so close to a 'living' graveyard, a calm peaceful oasis.

 

          - Due to its scale and size, this proposed development would tower above the nearby              Goodways Drive area, causing a huge overbearing blot on the landscape. It is out                   of character with the immediate surrounding properties, which are not more than 3             floors in height. It would be an over development for Larges Lane.

 

          Following the receipt of revised plans which amended the design of Block C only,           further targeted neighbour notification was undertaken informing the residents of                        Robins Gate and The Willows, Larges Lane of the changes. Any further                                  representations received as a result of this process will be reported to the Committee           via the Supplementary Report.

 

7.       SUMMARY OF CONSULTATION RESPONSES

 

          Highways

7.1     No objection to amended scheme subject to conditions. Detailed comments included              in report below.

 

          Lead Local Flood Authority/Drainage Officer

7.2     Requires further information to confirm that proposed drainage strategy is                                 suitable and achievable. Recommendation reflects this.

 

          Environmental Health

7.3     Noise

          Whilst the proposed development is located relatively close to the railway, there are                a number of buildings between which would be expected to provide a barrier effect           to protect the proposed dwellings from noise.  The railway is in a cutting which will             further reduce transmission of sound from the railway. The majority of neighbouring                   uses are residential, so residential in this location should be equally acceptable. The                proposed development will have a positive impact on local residents as much lower                  noise levels are expected of a residential development than would be associated                    with a football club, particularly on match days. There are therefore no noise                            objections.

 

          Air quality

          There are no air quality concerns.

 

          External Lighting

          There are no lighting concerns, and the proposed development would be expected                  to have a positive impact for existing local residents and wildlife with the removal of            the intense floodlighting associated with a football ground.

 

          Contaminated Land

          A contaminated land assessment has been submitted which recommends                                remediation for soil contaminants.  A condition requiring implementation of the                         Approved Remediation Scheme is therefore recommended.

 

          Construction and demolition impacts.

          A CEMP condition is recommended due to the scale of the development and the                      proximity to existing residential dwellings.

 

          SPA

7.4     An Appropriate Assessment has been carried out and the Council’s Environmental                   Policy Officer has no objection to the scheme subject to appropriate mitigation                          being secured by way of a completed S106 agreement.

 

          Biodiversity

7.5     The proposals are unlikely to affect protected or priority species, priority habitats or                  sites of importance for nature conservation.  The Biodiversity Net Gain Assessment                 Report uses a precautionary approach to the value of habitats in the proposed                            development and calculates that it would increase from 0.29 to 1.71 biodiversity                       units (equivalent to a 483.11% increase). This demonstrates a clear biodiversity net                   gain which should be secured by condition.

 

          Conditions are also recommended to secure biodiversity enhancement such as swift                boxes and other wildlife features around the site.

 

          Archaeology

7.6     The applicant has submitted an archaeological desk-based assessment in support                  of its application. Considering the known archaeology in the vicinity and the                        previously undisturbed nature of large areas of the site, the assessment notes that                 the site has some archaeological potential and the proposed development will                           impact on below ground deposits. The report concludes that a programme of

          archaeological work is therefore likely to be required and can be secured by an                        appropriately worded condition.

 

          Berkshire Archaeology is in agreement with the conclusions of the assessment and                 recommends that a condition requiring a programme of archaeological work.

 

          Waste and Recycling Officer

7.7     There is one separate bin area for each of the three buildings with enough space                    for a total of 36 x 1100 litre and 22 x 360 litre bins. This is sufficient for fortnightly                          refuse and recycling collections.

 

          The bin stores for buildings A and C have adequate room and distance for bins to                    be taken to the collection vehicle and returned by the collection crews, providing                           there is a dropped kerb for the bins to be brought to the collection vehicle.

 

          The bin store for building B is in an undercroft, however this is within 25 metres of                   the collection point from the vehicle, so providing there are no slopes or access                              issues, will not need to be presented on collection day to an agreed collection point             for kerbside collection.

 

          The identified stores in Buildings A and B provide sufficient space to store communal               waste food bins, and the bin store in Block C is also of sufficient size providing that                  refuse collections are carried out on a weekly basis, rather than the standard                             fortnightly collection to flats, to reduce the number of bins required. Weekly refuse               collections are preferred by the Waste Team for large developments located close                to the town centre as they reduce the number of bins required and make collections                  as efficient as possible. Accordingly, it is recommended that a condition be                                      imposed, securing a refuse management plan which will ensure that plans for                        waste collection are in line with Council guidance and help with identifying the                          movement of bins from the stores to the collection vehicle.

 

          Renewable Energy Officer

7.8     The two renewable technologies most often used are air source heat pumps and                      Solar PV. If Solar is to be used a plan of the array will need to be submitted.                             Recommends condition that the development shall not begun until an Energy                           Demand Statement has been submitted to and approved in writing by the Local                             Planning Authority.

 

          Sport England

 7.9    No objection subject to conditions.

 

 

8.       MAIN POLICIES AND OTHER DOCUMENTS RELEVANT TO THE DECISION

 

8.1     The key policies and associated guidance applying to the site are:

 

 

Development Plan

NPPF

General policies

CS1 & CS2 of the CSDPD

SA2 of the SALP

 

Consistent

Open Space and Sport

CS8 of the CSDPD

Consistent

Residential amenity

Saved policy EN20 of BFBLP

Consistent

Design and Character

CS7 of CSDPD, Saved policy EN20 of BFBLP

Consistent

Parking

Saved policy M9 of BFBLP and CS23 of the CSDPD

Consistent

Supplementary Planning Documents (SPD)

Design SPD (2017)

Other publications

National Planning Policy Framework (NPPF) and National Planning Policy Guidance (NPPG) 

Bracknell Town Neighbourhood Plan (“Made” October 2021)

 

 

9.       PLANNING CONSIDERATIONS

 

9.1     The key issues for consideration are:

 

          i Principle of development

          ii Impact on character and appearance of the area

          iii Impact on residential amenity

          iv Transport implications

          v Biodiversity and Landscaping

          vi Drainage

          vii Affordable Housing

          viii Sustainability and Energy

          ix Thames Basin Heaths SPA

          x S106 Obligations

          xi Community Infrastructure Levey/ CIL

 

i.        Principle of development

 

9.2     The site is located within the defined settlement boundary of Bracknell. It is in a                        sustainable location, approximately 0.5km from Bracknell Town Centre and within                    walking distance of Bracknell Railway Station and several bus routes. In                                       accordance with the provisions of CSDPD Policy CS2 (relating to locational                         principles) new residential development consistent with the character, accessibility              and provision of infrastructure and services within Bracknell would be acceptable                         in this location.  The site also forms part of a site allocated under SALP Policy SA2            for residential development, with an indicative capacity of 102 units (of which 18                            have been built/ have full planning permission on part of the site (Robins Nest).

 

9.3     However, the development proposed would result in the loss of football playing                        field and stadium site. Paragraph 96 of the NPPF states that “access to a network                  of high-quality open spaces and opportunities for sport and physical activity is                     important for the health and well-being of communities. Planning policies should be              based on robust and up-to-date assessments of the need for open space, sport                       and recreation facilities (including quantitative or qualitative deficits or surpluses)                          and opportunities for new provision. Information gained from the assessments                             should be used to determine what open space, sport and recreational provision is                    needed, which plans should then seek to accommodate.”  As part of its evidence                     base for the Submitted Local Plan the Council has carried out the assessment                    required by paragraph 96 (the playing pitch strategy [PPS]). This states that the                           Larges Lane “site should be protected as playing fields as part of the Local Plan.                           This is one of the major football sites in the area and is privately owned by the                            club. The club is currently building a full-sized FIFA 1* Artificial Grass Pitch (AGP)                 to be used for matches by the senior club at all levels. The club is looking to                             develop the nearby pitches at Ranelagh school to provide a large, high-quality                          supply of grass pitches”.

 

9.4     It is acknowledged that at present there is a conflict between the allocation of this           site in SALP and the above recommendation of the PPS. 

 

9.5     Of particular relevance to this application Paragraph 97 of the NPPF states that                        “Existing open space, sports and recreational buildings and land, including playing                   fields, should not be built on unless:

          a) an assessment has been undertaken which has clearly shown the open space,                    buildings or land to be surplus to requirements; or

          b) the loss resulting from the proposed development would be replaced by                                equivalent or better provision in terms of quantity and quality in a suitable location;                   or

          c) the development is for alternative sports and recreational provision, the benefits                  of which clearly outweigh the loss of the current or former use.”  

 

          Ground b) is relevant to this application.

 

9.6     The above national policy is reflected in local policies which are consistent with                        this. Core Strategy (2008) Policy CS8 states that development will be permitted                     which; i. retains, improves and maintains existing Recreational Facilities; and/or

          ii. provides and maintains new Recreational Facilities.  

          Appendix 4 of the SALP sets out a number of requirements to be met in the                              development of the allocated sites.  Of particular relevance to the current                                  application is the requirement to provide an alternative location for the Football                        Ground.

 

9.7     Bracknell Town Neighbourhood Plan was “made” in October 2021. Policy EV 1                        states:

          “Open Space of Public Value

          Development proposals are expected to retain all Open Space of Public Value                          provision as shown on the Policy EV1 Open Space of Public Value Map. [This site                   is explicitly listed under Policy EV1] ….

          Proposals that would result in the loss of Open Space of Public Value will only be           supported when alternative public open space is provided to address both the                        existing area of open space lost and any additional open space needs created by                 the development.

          Alternative public open space provision proposed as part of such development                         proposals will be required to meet the following criteria:

          • the scale of alternative provision must be of at least an equivalent scale to the                        existing public open space provision and

          • any alternative site must be of at least an equivalent standard, or better, in terms                   of layout to the existing public open space provision and

          • ancillary uses which are required to complement the provision of the open space                   must not significantly reduce the overall area of open space and

          • the location of the alternative provision must be generally accessible by foot and                    within or adjacent to the existing settlement boundary of Bracknell Town

 

          It is noted that Bracknell Town Council has not objected to this application.

 

9.8     In response to the policy framework set out above, the applicant has put forward a                   package of mitigation measures which it considers satisfies the policy requirement.                 The proposed mitigation package would replace the loss resulting from the                                      proposed development with an equivalent or better provision in terms of quantity                            and quality in a suitable location.

 

9.9     The applicant has explained that the football club wishes to relocate in order to                         improve its facilities and to enhance opportunities for grassroots and community                      football in the Borough. The FA has updated its Ground Grading Requirements                      which means that the current ground is not compliant with the new safety                               standards required.  It is understood that the ground would require a standing                             capacity of 1,950 for supporters as stipulated for this league and in order to allow                        the opportunity of achieving the maximum future potential of 3,000.  A greater                    investment is therefore required in order to progress beyond the current league                             status.  A crucial limitation of the current facility is its design and its lack of                                opportunity to provide equality with regards access for female and disabled                               spectators.  In order to realise its future ambitions, the club has stated that it needs                  to move to a larger stadium outside of Bracknell town centre. Indeed, it has already            vacated the Larges Lane  site and the refusal of the current application will not                             secure the football club’s continued use of the site.

 

9.10   In response to these constraints and pressures the football club has implemented                    a package of replacement facilities including shared use of facilities at Ranelagh                         School and a shared facility with Sandhurst FC at Bottom Meadow, Sandhurst.

 

9.11   The Ranelagh School Larges Lane Playing Fields Site (now known as the SB                           Campus Larges Lane) obtained planning permission (application 20/00162/FUL                       Approved 10.11.2020) for the erection of a sports pavilion with associated access                 and car parking. This application did not make a clear link to the redevelopment of                the current stadium site at Larges Lane. The only link made was a passing                              reference in paragraph 4.3 of the design and access statement: “the site will be                     used by Bracknell Town Football Club during the week for youth training, and                           junior/youth non-competitive games at the weekend”. Separately from this planning               permission a number of pitch improvements have been carried out which did not                      require planning permission.

 

9.12   Also in partnership with Ranelagh School, Bracknell Town Football Club (BTFC)                      has an agreement to use the Multiuse Games Area within the main school site                      which has been upgraded from a tarmacadam surface to a 3G surface. Whilst it is                 the view of BTFC that planning permission was not required for this development,              there was no linkage made to the stadium site the subject of this application. This                 was completed in 2020.

 

9.13   The third part of the mitigation package relates to the Sandhurst Town FC site at                      Bottom Meadow, part of the Sandhurst Memorial Park owned by Sandhurst Parish                  Council.  This site has recently been upgraded under planning application                                      19/01085/FUL.  This granted permission for the replacement of the natural grass                           football pitch with a 3rd generation artificial surface with associated 2.4m enclosure                  fence and hardstanding; the erection of new 1.2m pitch enclosure to replace                           existing pitch barrier fence, the installation of a new spectator stand and relocation                 of the existing spectator stand, the installation of a new turnstile entrance, team                       shelters and maintenance storage container, and the replacement of existing                             floodlight system with new 18m high columns and LED luminaries. This was                             granted planning permission on 27th November 2020. Neither Bracknell Town                         Football Club or the stadium site at Larges Lane was mentioned in the design and              access statement which focused on Sandhurst Town. Notwithstanding this the                           applicant has made clear that this application was to be the replacement for the                      Larges Lane stadium site, yet there was no clear linkage.

 

9.14   The current application attempts to link the aforementioned sites as mitigation for                    the loss of the Larges Lane stadia site. There is always an element of doubt when                a post rationalism narrative is provided for justification in planning for the loss of a           site. Furthermore, when the above sites are considered as mitigation toward the                      loss of the stadium site, there are two issues which need to be considered:

          1. There remains a loss of a natural grass pitch.

          2. The existing stadium is a freehold, whereas the new stadium site at Sandhurst                     Memorial Park, has a 15-year lease which is renewable.

 

          Dealing with the first point, Sport England considers that the improvements of the           pitches and MUGA at Ranelagh School can be considered to enhance the carrying           capacity of the pitches and coupled with the new 3G AGP at Sandhurst will provide               more hours of football overall. However, it acknowledges that the mitigation                       proposed does not strictly meet any of the planning policy exceptions.

 

9.15   Addressing point 2, the Sandhurst site has been, as a matter of fact, enhanced for                   football and Sport England, in line with the NPPF, is concerned about overall                           provision and not individual clubs.  Bracknell Town FC has voluntarily given up its                freehold and accepted a 15 year (renegotiable) lease, which is their choice.                            However, the key is that the facilities on this site have been enhanced to meet the               loss of the stadium site, which will allow another club to use them in the future                            should Bracknell Town FC move on.

 

9.16   In conclusion on this issue, it is accepted that the proposal does not meet any of                      the planning policy exceptions set out in NPPF paragraph 97 or strictly comply with              Policies CS8 or EV1.  However, Sport England, the county Football Association                     and the Football Foundation are all supportive of the application due the benefits                      which have been brought to grass roots football.  Whilst the 3G Artificial Grass                             Pitch has not been installed at Sandhurst yet, there is a public commitment from                            BTFC for this work to be completed.  However, as the applicant has control over                            both sites, it is considered that a Grampian style condition could reasonably be                             imposed.  This would prevent the development of the Larges Lane site until all the                   works permitted under application 19/01085/FUL have been legally and fully                             completed in accordance with the approved plans. In view of the importance                            placed on the benefits to grassroots and community football in reaching this                           balanced recommendation it is also considered necessary to require the                                completion of Community Use Agreements (CUAs) in relation to the three                                     mitigation sites.  The applicant has advised that it is currently updating existing                        Community Use Agreements and, once finalised, these CUAs can be secured by                        way of a Grampian style condition requiring their implementation and retention so               that appropriate long term mitigation may be provided.

 

9.17   In summary this application proposes residential development on a site which is                       allocated for housing within the SALP. The loss of the existing football ground has                   been replaced with a package of replacement facilities that, on balance, in total are                 considered to represent an equivalent provision subject to conditions relating to the            full implementation of the upgrade at Sandhurst and the completion of Community             Use Agreements in relation to the mitigation sites. The proposed development is                           therefore considered to be acceptable in principle and in accordance with CSDPD                Policies CS1 (Sustainable Development), CS2 (Locational Principles), CS8 and                        the NPPF subject to it having no adverse impacts upon the character and                                 appearance of the surrounding area, residential amenities of neighbouring                                properties, transport or other issues of acknowledged importance. These matters                     are assessed below.

 

 

 

ii.       Impact on character and appearance of the area

 

9.18   Core Strategy Policy CS7 and BFBLP 'Saved' Policy EN20 relate to design                               considerations in new development and seek to ensure that developments are                         sympathetic to the character of the area. More detailed guidance is provided in the                  Design SPD (2017). 

 

9.19   The proposed development is the erection of three apartment blocks to provide                       117 apartments on the site, together with associated access and parking provision.               As reported above the site forms part of a larger site allocated for 102 units in the             SALP.   It is important, therefore, to assess the bulk and massing of the proposal                       and the balance between built form, parking and usable amenity for future                                   residents when looking at dwelling numbers that considerably exceed those set out              in the SALP.  In assessing appropriate development on this site, some analysis of                the site and context is also needed.

 

9.20   Policy CS7 of the Core Strategy requires high quality design that “build[s] on the                      urban, suburban and rural local character, respecting local patterns of                                       development”, “enhance[s] the landscape and promote[s] biodiversity”, aids                              movement through “accessibility, connectivity, permeability and legibility”, provides                  “high quality usable open spaces and public realm” and looks to “innovative                             architecture” which would be appropriate within the context of Bracknell’s new                             town heritage.

 

9.21   Saved Policy EN20 states that the Council will consider whether a proposal is                          “appropriate in scale, mass, design, materials, layout and siting, both in itself and                     in relation to adjoining buildings, spaces and views”; whether it “retains” and where                appropriate “enhances” beneficial landscape; promotes “or where necessary                             creates, local character” and provides “adequate space for private use and                                    amenity”. 

 

9.22   Issues discussed within the Design SPD include placemaking, integrating                                 development into the existing context, making connections to surrounding facilities                  such as schools and town centres, contributing to the environmental sustainability              of the development itself and SuDS and surface water drainage management.  It                        states at paragraph 3.3.3 that “plots should be large enough to accommodate the             proposed built development and the requirements associated within (such as                        amenity space, parking, servicing, waste and recycling collection) in an                                  arrangement that is practical and attractive.  They [plots] should be configured to                    make sure that new development relates well to its neighbours.” This is reinforced                   at 3.9.1.  Paragraph 3.9.8 states that there should be “a balance between building              footprint, its position on the plot in response to local character, parking provision                           and usable amenity space for residents.”

 

9.23   In addition to the above policies and design guidance, the site falls within Area A of                 the Bracknell Study area of the Character Area Assessments SPD.  Key issues of                character in this area including the “Central open space enables views across the                 character area to the surrounding landmarks such as Holy Trinity Church” relate to                conserving and enhancing hedge and tree planting in this area.  The area is also                             described as a transitional area between the lower density Victorian elements and                    the higher densities in the town centre.  New development proposals are seen as                         being apartment blocks.  Cohesion is stated as being important for new                                    development coming forward and so enhancing links to the existing network and                      approaches to the town centre would be a key objective for development within                        this character area.  Landscape and townscape are also detailed as reflecting the                 transitional character of the area and contributing to creating a stronger sense of                            place. 

 

          Layout

 

9.24   The layout below has evolved from the previous (withdrawn) planning application                     20/00350/OUT, pre-application discussions and public consultation responses.

 

 

 

          It is considered that the required high quality of design for this site has now been                      achieved.  This has been achieved through a significant reduction in the number of                  units from 164 to 117 which has resulted in a reduction in the scale of the                               buildings; reduced parking and increased landscaping and amenity space.  Block                          A has been reduced in length and re-sited 2.5m north closer to the boundary with              the cricket pitch.  This, together with the omission of the previous access road and               parking area along the northern boundary would create a softer setting for this                       block.  The revised layout in this area would form a green edge to the development                  along this northern boundary, providing a transition area between the buildings and                 the cricket club site.

 

9.25 The revised layout also enables a much stronger frontage to Larges Lane to be                        provided than under the previous proposal, creating a positive view into the site,                       concluding the view from the east.  In addition, this provides some legibility, giving                   visual clues as to what is within the site.  It is considered that the changes that                          have been made would result in an attractive street scene and create a positive                       view on entering the site, providing a more positive arrival vista than previous                     layouts. Other changes include moving the parking area to the eastern boundary                         1.5m off the boundary allowing a wider 2.0m planting buffer to be introduced                    between the proposed developments and the Robin’s Gate development which                            would soften this boundary. Overall, it is considered that the amended scheme                        would create a much better arrival into the site and sense of place from the Larges                   Lane streetscene.

 

9.26   The lower number of units has enabled an appropriate balance to be achieved                         between the number of parking spaces provided within the courtyard and the                           available space for landscaping.  This has addressed previous concerns that on                            entering the site, parking would dominate the internal courtyard which would                            appear as a sea of parked cars enclosed by a vertical wall forming the entrance to             the basement car park. The illustrative plans (landscaping is a Reserved Matter)                            show how a good quality enhanced landscape scheme, including vertical                              landscaping and arched brick openings/ colonnades to the podium wall could be                        used to create an attractive and less car dominated pedestrian environment within                    the courtyard.

 

          Design and External Appearance

 

9.27   The bulk and massing and appearance of the proposed blocks is illustrated by the                   following drawings and illustrative view:

 

 

 

 

 

 

 

ILLUSTRATIVE VIEW OF BUILDING B SHOWING ACCESS TO UNDERCROFT PARKING

 

 

9.28   The design and external appearance of the three blocks is considered acceptable                   in this location.  The height, bulk and mass of the blocks have all been reduced                           from the previous scheme and are now considered to be appropriate within the                             context of the site and the surrounding area.  Overall, it is considered the                                   development would create an interesting, attractive and varied appearance that                         picks up on a similar materials palette to other recent apartment blocks on Larges                   Lane, which is welcomed.

 

9.29   In conclusion on this issue, it is considered that the revised layout and the                                 relationship with existing development in the immediate vicinity is greatly improved                  from the previous scheme and the development would be at an appropriate scale                for this site.  It would provide a high-quality design solution with sufficient legibility                to navigate the site easily, particularly for pedestrians.   The proposal is considered             to strike an appropriate balance between creating a distinctive and attractive sense                 of place while delivering a significant amount of sustainable housing and making                            efficient use of urban land.  As such it is considered that the proposed                                      development, while creating its own distinctive character would respect the existing                  character and appearance of the Larges Lane street scene and surrounding area                    and as such would be in accordance with those issues relating to character set out           in Policies CS7 and EN20 and the adopted Design SPD guidance.

 

iii.      Impact on Residential Amenity

 

9.30   'Saved' Policy EN20 of the BFBLP states that development should not adversely                      affect the amenity of surrounding properties. The NPPF at paragraph 127(f) states                   that developments should ensure a high standard of amenity both for existing and                 future users.  Privacy is discussed at paragraphs 3.9.11 – 3.9.19 of the Design                      SPD.  Paragraph 3.9.13 states that “As storeys rise additional separation distances               may be necessary to mitigate against overlooking, overshadowing and overbearing              impacts.” 

 

9.31   The proposed blocks on the southern and western edges of the site on the                               previous scheme were considered to be too close to neighbouring residential                            properties.  In particular, the development was considered to have an overbearing                   relationship with The Willows to the south with potential overlooking of its private                     amenity space from apartments on the upper floors of the block C.  In addition, the             separation between existing blocks of flats and the proposed new apartments                     along the western and southern edges was also considered unacceptable.

 

9.32   The amended scheme reflects considerable efforts made to address these issues.                  In particular block C has been moved approximately three metres further from the              southern boundary with The Willows providing a separation distance to the                                  boundary of a minimum of 17.5m.  Furthermore, the western side of block C has                           been reduced from four to two stories where it is adjacent to the rear garden of                             The Willows.  This substantially reduces the bulk and mass of this building,                                  addressing concerns about being overbearing and overlooking the private garden                  area of The Willows. There are no habitable rooms in The Willows that face                             directly towards the proposed apartments, and it is therefore considered that the                      amended proposals would now have an acceptable relationship with that property.

 

9.33   In the most recent iteration of the plans submitted further to the consideration of                      the application by the Advisory Meeting of the Planning Committee, the height of                           Block C has been further reduced by the removal of the third storey                                            accommodation previously proposed parallel to the site’s eastern edge, further                      improving the relationship between the proposed development and the adjacent                             dwellings in Robins Gate.

 

9.34   The other main area of concern with the previous scheme was the relationship of                         Block B with existing apartment blocks at Mount Pleasant and Hunts Green Court.              Block B has now been reduced in length providing substantially greater separation             with the Mount Pleasant flats to the south.   The minimum separation distance has           increased from 15.5m to 19.5m. In addition, there are no habitable windows in the               closest elevations of these flats facing towards this site.  It is therefore considered              that the amended scheme provides an acceptable relationship with the Mount                             Pleasant flats. 

 

9.35   The reduction in the length of block B has also ensured that there is no building                        immediately behind the east facing flats at Hunts Green Court.  A minimum                              separation distance of 23.5m is now provided with the buildings set at an angle to                    each other so any window-to-window views would be oblique.  It is therefore                            considered that the amended scheme provides an acceptable relationship with the             Hunts Green Court flats.

 

9.36   Building A would have a separation distance of 22.5 metres to the side elevation of                 4 Robins Gate which is considered to provide acceptable separation to prevent                           any adverse loss of light and privacy, especially as the west-facing side windows                       to 4 Robins Gate do not serve habitable rooms.  Building C would have a                                    separation distance of 25 metres to the edge of the rear gardens of the properties                  of Robins Cottages, and a 35 metre building-to-building separation. This would                    exceed the minimum back-to-back distance requirements set out in the Design                          SPD. There would also be a separation space of 25 metres between Building C                       and the apartments of 5-12 Robins Gate which is considered acceptable.

 

9.37   In conclusion on this issue it is considered that the amended scheme has                                 satisfactorily addressed the previous concerns in respect on the impact on the                          residential amenity of neighbouring properties and would provide adequate                               separation distances.  It would not be unduly overbearing or give rise to                                    unacceptable levels of overlooking or loss of light to any existing residential                    properties.  The proposed development, as amended, is therefore not considered                  to materially harm the amenity of surrounding properties and would therefore be in                accordance with 'Saved' Policy EN20 of the BFBLP.

 

 

iv.      Transport implications

 

          Access

9.38   The site is located on Larges Lane, which is subject to a 30mph speed limit.  As                      well as providing access to this site, Larges Lane also serves a local school, a                       cemetery and existing housing.  The road has controlled on street parking along its            length to control vehicle speeds along it. In relation to wider access to the site the               pedestrian routes from the site towards the town centre and wider pedestrian                     routes are good.

 

9.39   The current site has a wide shared access which it shares with the adjacent cricket                  club. It is proposed to create a new access in approximately the same location as                    the existing. The existing access to the cricket club onto Larges Lane would also                           be closed and a new access to the cricket club created off the new access road to              this site. Such an arrangement is considered to represent an improvement in                         highway terms over the existing situation and would improve access for vehicles                    and pedestrians.

 

9.40   The internal road has been designed to be appropriate for the scale of the                                development and will be sought for adoption to ensure refuse collection and                             access to the cricket club can be achieved without ransom. The road would be 6m                wide and has footways on both sides. This is considered adequate for the scale of               the development. Due to its design, internal speeds are expected to be controlled                to 20mph. Adequate visibility is provided within the development and at the                                     junction with Larges Lane.

 

9.41   The original plans indicated that a refuse vehicle would overrun the centre line of                     the internal road by a noticeable amount. The applicant has addressed this                                    concern by altering the radii of the bends within the site access.  The amended                        layout is now considered acceptable as it will allow larger vehicles to pass through            the site safely reducing the potential for conflict with other vehicles or the kerb                        edges of the road.

 

9.42   The internal road is likely to require double yellow lines to control parking along it                     to ensure any potential overspill parking from the surrounding area does not occur.            Legal Agreements will be required to secure these.  Lighting within the site and the                    pedestrian routes will be required.  This can be conditioned and will also be                       covered by the adoption agreement. As part of the access works, off-site highway                works will also be required, including alterations to the current on street parking                    bays on Larges lane. This involves creating a section of layby parking opposite the              site entrance which will improve the safety of the access arrangements, particularly                 as there will be an intensification of use over the course of the day.

 

9.43   There will also need to be a minor modification to the current on street parking                          restrictions to ensure the on-street parking provision that currently exists will be                        maintained in the future.  Although the on-street parking has capacity for many                        parts of the day, it is heavily used during school pick up and drop off and therefore             maintaining this capacity is important. The minor change involves reducing the                      extent of double yellow line near to Gipsy Lane by around 5-6m. This would not                         have a significant impact on the visibility of the junction.

 

9.44   In respect of pedestrian access, the Highway Officer has stated that as well as the                   internal road and turning head, the proposed footway in front of block A that runs                     to the Cricket Club would be sought for adoption for public access and any future                     development opportunities.  This footpath is steeply inclined in front of Block A and           the Highway Officer raised concerns about the gradient as it provides pedestrian                            access to and from block B.  However, the applicant has explained that the primary              accessible route to this building is through the courtyard and the under-croft car                             park. The footpath running parallel to the cricket club is an additional route to                          Building B and is therefore technically not required to achieve the 1:20 gradient.

 

9.45 Whilst detailed design will be provided at a later stage via Reserved Matters, the                     site plan has been amended to show indicative levels and ambulant disabled steps               proposed for the northern footpath. Relevant drawings to Building A have also                         been amended to reflect the levels which resulted in some changes to the northern                 elevation and ground floor plans.  The applicant considers that this goes well                        above the minimum requirements given its status as a secondary route and is in                         full compliance with Approved Document M of the Building Regulations for                                wheelchair users.

 

 

9.46  The Highway Officer has provided further comments on the issue of the ramped                       route north of Block A, stating:

 

          ‘I have looked at the submission made and have the following comments. The                          applicant indicates that the route north of the block is a secondary route as                               alternative provision is via the undercroft car park. The primary route that the                            applicant refers to appears to direct pedestrians into the main circulatory area of                            the car park and is not ideal for pedestrians. The route that runs to the north of                           block A is also to serve the cricket club and in the longer term could provide a                       suitable pedestrian link as part of any redevelopment of that area and so the need              to have it accessible for all is important. It will be sought for adoption to provide                    public access and so having it accessible without steps would be key. Looking at                     the levels plans it is not clear why a suitable 1:20 ramp without steps cannot be                       achieved on this route. I appreciate that due to the deck over the car parking that                     the levels back towards block B mean that steps may be required but as the plans                do not show the full extent of the site on the levels elevation it is not clear if an                             alternative ramped route alongside the route to the cricket club could be achieved             as well to provide a route suitable for those users with mobility issues in addition to             the steps.

 

          I would agree that conditions to cover such matters could be used but if further                         consideration could be given to this issue now, at least on the main route to the                       cricket club, it should be to demonstrate that suitable access can be achieved                            without further impacts on the layout’.

 

9.47   In response to these comments, an additional condition has been recommended                      securing details of the footpath to the north of the Block A including their                                   connections to adjoining pedestrian routes within and beyond the site in order to                      ensure that this route provides an accessible pedestrian link to the cricket club.

 

 

          Parking

9.48   As original considered by the Advisory Committee, the development proposed a                       total of 167 parking spaces for the 126 units (250 bedrooms) proposed                                      representing a ratio of 1.33 spaces per unit (0.67 spaces per bedroom). Whilst this                  is below the level set out in the parking standards, the site is located very close to               the town centre and is in an accessible location.  Further justification of the level of            parking proposed was provided in the form of parking surveys of a number of                     recent developments in the local area which are also located in accessible                                    locations and close to public transport and the town centre.

 

9.49   In providing a critical analysis of this information, the Highways Officer also                               requested further parking beat surveys of on-street parking demand at and around                  the residential developments of Sterling Square and Fleming Place to understand                the extent that these streets are subject to parking stress which may, in part, be                            contributed to by these new developments and hence result in additional parking                             demand which is unaccounted for within the initial parking beat surveys.

 

9.50   A further check was also carried out using the parking demand as a ratio per                            bedroom to ensure that developments which may have higher levels of 2+                                bedroom units were evenly factored in.

 

9.51   The results of these surveys are set out below:

 

 

 

 

 

 

 

 

 

 

9.52   In light of the submitted information, the Highways Officer confirmed that the level                   of parking proposed to serve the development would appear to be sufficient and                          recommended that the parking should be conditioned as communal to provide the               greatest flexibility.

 

9.53   Further to the submission of amended plans, the Highways Officer has provided                      the following comments:

 

          ‘The proposal has reduced in scale to 117 units within Building C and this appears                  to be the major change to the layout. The parking layout appears to remain the                            same but the change in unit numbers will have an impact on the parking ratio for                         the site. There are a total of 167 spaces for 117 units which equates to a ratio of                          1.43 spaces per unit. The applicant has however now elected to allocate three of                      these spaces to a car club. These spaces are welcomed as they provide an                            opportunity for residents who do not own a car or choose not to own a car to be                            able to use such a facility when required. The long term retention of such a facility               is questioned though as the evidence provided with the application does indicate                      that sufficient car parking would be available for residents and so reliance on a car                  club is likely to be less. This site although close to the town centre has a much                           higher parking ratio than town centre sites. It is advised that the car club for the                           site be secured by S106 agreement. Clearly with a reduction in the scale of                                development the parking ratio has increased from the previous level. However as I                  found the previous level acceptable the changes proposed do not impact my                      earlier conclusions subject to the conditions related to parking allocation as                                     advised previously.

 

          It is also noted that the electric vehicle charging provision for the site has also                           altered with 20% active spaces provided for residents with the remainder now                          being passive with the infrastructure being provided so that spaces could be easily                   converted as demand increases. The car club spaces are also proposed to have                             active electric vehicle charging. This is acceptable and should be conditioned….

 

2

39

0.95

0.57

 

1

37

1.32

0.79

 

3

8

1.00

0.57

 

23

118

0.96

0.56

 

31

134

1.35

0.85

 

Average Ratio

1.12

0.67

 

Potential On-Street

Total inc On-Street

Parking Demand Ratio (per Unit)

Parking Demand Ratio (per

Bedroom)

 

 

2

39

0.95

0.57

 

 

1

37

1.32

0.79

 

 

3

8

1.00

0.57

 

 

23

118

0.96

0.56

 

 

31

134

1.35

0.85

 

 

Average Ratio

1.12

0.67

 

Potential On-Street

Total inc On-Street

Parking Demand Ratio (per Unit)

Parking Demand Ratio (per

Bedroom)

 

2

39

0.95

0.57

 

1

37

1.32

0.79

 

3

8

1.00

0.57

 

23

118

0.96

0.56

 

31

134

1.35

0.85

 

Average Ratio

1.12

0.67

 

 

 

9.54   In addition to the issue of vehicle parking, the applicant has provided details of the                   proposed cycle parking for the blocks. The plans indicate the ability to provide                          parking within the cycle stores using the     Council’s preferred Sheffield type stands                   which is acceptable. Provision of 250 spaces for residents and 28 spaces for                       visitors have been indicated. It is expected that Block B will require access to the                            store on the western end of Block C to ensure sufficient provision is made for                        Block B. Conditions are advised for final details to be submitted.

 

          Traffic Impact

9.55   Further work has been carried out in relation to the proposal using the BFC traffic          model as well as using traffic count information. A sensitivity test has also been                    carried out which takes account of current traffic that may be generated by the                          current club during the peak hours. In that respect the analysis has taken some                            account of the activities related to football at Ranelagh School playing fields near                           to the site.

 

9.56   The impact on the local road network, especially the MET Office roundabout and                      Eastern roundabout, where development traffic will have the most impact, are not                    considered to be negatively impacted by the proposal.  The Highway Officer has                      confirmed that the small change in the scale of development will also reduce the                             peak hour and daily trip levels from or to the site but the change is not significant                          and the previous testing of the local road network and junctions is considered                    robust in that regard.

 

9.57   Construction traffic to the site will need to be coordinated and some of the offsite                      works may well be required prior to development to ensure that safety and on-                         street parking are not compromised by construction traffic. Conditions are advised                    to control such matters.

 

9.58   Given the above, the application is not considered to result in any adverse highway                  safety implications and as such complies with BFBLP Policies M4, M9 and CSDPD                 Policies CS23 and CS24 and the NPPF.

         

v.       Biodiversity and Landscaping

 

9.59   The Council’s Biodiversity Officer has commented that the submitted Biodiversity                    Net Gain Assessment Report uses a precautionary approach to the value of                          habitats in the proposed development and calculates that it would increase from                           0.29 to 1.71 biodiversity units (equivalent to a 483.11% increase). This                              demonstrates a clear biodiversity net gain.  Conditions are advised to secure                      biodiversity net gain in line with, or better than, the submitted Biodiversity Net Gain             Assessment Report and to secure biodiversity enhancement such as swift boxes                            and other wildlife features around the site. A Section 106 obligation to secure                           biodiversity net gain monitoring is also recommended.

 

9.60   Whilst landscaping is a Reserved Matter an indicative layout has been provided                       showing general configurations of hardsurfaced areas, amenity spaces and other                     landscaping.  It is considered that the development could provide adequate space                   for soft landscaping and amenity spaces that would enhance the character of this             urban location. The overall amount of landscaping proposed has been significantly               increased from the previous submission.

 

9.61   Existing trees on the boundaries of the site are proposed to be retained. While                          none of these trees are subject to Tree Preservation Orders (TPOs), they are                           beneficial to the character to the area and would provide amenities for prospective                occupants. A full Arboricultural Survey has therefore been provided, outlining                          protection measures to these trees in respect of the construction process.

 

vi.      Drainage

 

9.62   The entire site is located within Flood Zone 1 however, as it exceeds 1ha in size,                    a Flood Risk Assessment (FRA) accompanied the application. Following                                      consideration of this information, the Council’s Drainage Consultant raised a                       number of concerns in respect of the proposed drainage arrangements. Additional                information was submitted which addressed a number of concerns,                                           however at the time that the application was considered by the Advisory                                 Committee, there remained a couple of outstanding issues including relating to the              fact that the proposed discharge rate to the public sewer had not been agreed with                  Thames Water so it could not be confirmed that there was sufficient capacity within                  the drainage network. Additional information has recently been provided by the                     applicant, including a response from Thames Water, and the views of the Drainage               Engineer have been sought and will be reported to the Committee via the                               Supplementary Report.

 

          9.63   It is not considered that this matter can be subject of conditions as Members                            will wish to be assured that the drainage strategy is suitable and achievable before               granting planning permission for any development. Accordingly, the                                           recommendation being made to the Committee is subject to the receipt of                                      satisfactory information to demonstrate that the proposed       drainage strategy                             is suitable and achievable.

 

vii      Affordable Housing

 

9.64   The development will deliver 25% on-site affordable housing provision, in                                  accordance with the current policy requirement and is therefore acceptable.  This                    affordable housing will be secured through a S106 agreement.

 

 

viii.    Sustainability and Energy

         

9.65 Application of CSDPD Policy CS10 requires the submission of a Sustainability                          Statement covering water efficiency and demonstrating how average water use in                    new dwellings would be restricted to 110 litres/person/day.

 

9.66   For residential development of more than 5 dwellings, CSDPD Policy CS12                             requires the submission of an Energy Demand Assessment demonstrating how                       the development's potential carbon dioxide emissions will be reduced by at least                            10% and how 20% of the development's energy requirements will be met from on-             site renewable energy generation.

         

9.67   Compliance with Policies CS10 and CS12 can be secured by means of                                     appropriately worded conditions.

 

 

         

ix       Thames Basin Heaths Special Protection Area (SPA)

 

9.68 An Appropriate Assessment has been carried out for this proposed development in                  accordance with Conservation of Habitats and Species 2017 (as amended).                             Without any appropriate avoidance and mitigation measures the Appropriate                      Assessment concludes that the development is likely to have a significant effect                     upon the integrity of the TBH SPA with the result that BFC would be required to                           refuse a planning application.   In this instance, the development would result in a                  net increase of 116 dwellings within the 400m – 5km TBH SPA buffer zone and is                  required to make a financial contribution towards SANG and SAMM (including                             SAMM monitoring) which will be calculated on a per bedroom basis once the mix                     of the development is determined taking account of any affordable housing                               delivered.

 

9.69   As this development leads to a net increase of more than 109 dwellings, the                             development normally would require a bespoke SANG solution. However, on                           review of the SANG capacity the developer instead may make a payment                                       contribution towards strategic SANGs (subject to SANGs capacity in the right                       location within Bracknell Forest). Sufficient SANG capacity has therefore been                      safeguarded for this proposal.  The Council will carry out SANG enhancement                           works as part of its on-going SANG enhancement programme and the remaining                            SANG contributions (for example, to fund in-perpetuity maintenance) will also be                          taken through Section 106 Agreement contributions. Provided that the applicant is                    prepared to make a financial contribution towards the costs of SPA avoidance and                   mitigation measures, the application will be in accordance with the SPA mitigation                    requirements as set out in the relevant policies above.

 

x.       S106 obligations

 

9.70 A S106 Legal Agreement is required to secure the following:-

 

·                Affordable Housing – a minimum of 25% (29 dwellings) with a mix that generally                      reflects the type and size of market housing. In order to meet the Council’s priority                   needs, the tenure breakdown required is 22 dwellings affordable rent capped at                          LHA and 9 shared ownership.  The submitted Accommodation Schedule confirms            that the applicant is prepared to provide a total of 29 affordable units and email                             confirmation has been provided to confirm that the number and tenure of the                     required affordable housing can be secured by the s106 obligation.

·                Community Facilities - a contribution towards new community facilities under                            construction at Time Square.

·                Open Space of Public Value (OSPV) - This site should provide 3780m2 (0.95 acre)                 of on-site OSPV. The proposed on-site provision of amenity space plus the rooftop            garden meet that quantity requirement. In addition, a contribution of £2500- £3500                   per dwelling towards off-site provision would be sought. There are currently a                          number of OSPV projects seeking funding that are capable of serving the                                    development.

·                Biodiversity - The Council will look for a contribution towards monitoring the                     implementation and management of Biodiversity enhancements which are                                delivered on site.

·                Highways - A planning obligation will be required to secure completion of a s38                        agreement for highway/foot/cycleway maintainable at public expense. A planning                     obligation will also be required to secure a S278 agreement for any off-site works                            proposed to the public highway as well as to secure the car club now proposed by                 the applicants.

·                SuDS - A planning obligation will be required to ensure approval of a Drainage                         Strategy which should include a Design Specification and Implementation Strategy                  and a long-term Management and Maintenance Plan prior to commencing on site.                    A planning obligation will also be required to secure a SuDS monitoring                                 contribution to monitor SuDS for the lifetime of the development.

 

xi       Community Infrastructure Levy/ CIL

 

9.71 Bracknell Forest Council has an adopted Community Infrastructure Levy (CIL). CIL                 is applied as a charge on each square meter of new development. The amount                            payable varies depending on the location of the development within the borough                           and the type of development.

 

9.72   CIL applies to any new build (except outline applications and some reserved                             matters applications that leave some reserved matters still to be submitted)                              including new build that involves the creation of additional dwellings.  This                                      application involves a net increase in dwellings and floorspace and would therefore                be liable for CIL.  However, the application site is within the Central Bracknell                     charging zone which has a nil charging rate.

 

 

10.     CONCLUSIONS

 

10.1 Planning permission is sought for the erection of 117 residential apartments (14 x                    1 bed, 89 x 2 bed, 14 x 3 bed) in three detached blocks following the demolition of            the existing buildings.  This is an outline application, but all matters other than                         landscaping are to be considered at this outline stage. The site is located with the            defined settlement boundary of Bracknell. It is within a sustainable location,                        approximately 0.5km from Bracknell Town Centre and within walking distance of                    Bracknell Railway Station and several bus routes.

 

10.2 Policy SA2 of the Site Allocation Local Plan allocates this site for housing with an                     estimated capacity of 102no. dwellings.  The loss of the existing football ground                       has been replaced with a package of replacement facilities that, on balance, in                      total are considered to represent an equivalent provision subject to conditions.                        The development proposed is therefore considered to be acceptable in principle.

 

10.3   The development would be at an appropriate scale for this site and would provide                    a high-quality design solution with sufficient legibility to navigate the site easily.                           The proposal is considered to strike an appropriate balance between creating a                     distinctive and attractive sense of place while delivering a significant amount of                      sustainable housing and making an efficient use of urban land.  As such it is                          considered that the proposed development, while creating its own distinctive                      character would respect the existing character and appearance of the Larges Lane                    street scene and surrounding area.

 

10.4 The proposal is considered to provide adequate parking and would not result in                       any significant highway safety implications. Recent amendments to the scheme,                             reducing the number of units proposed and providing 3 car club spaces improves                       the parking ratio when judged against the Council’s adopted standards, and                            secures additional EV charging infrastructure.

 

10.5   The layout and design ensure that the development will not adversely impact on                       existing occupiers and provides an appropriate standard of amenity for future                           residents. Subject to conditions and a completed S106 agreement, the                                   development will provide policy compliant biodiversity mitigation and                                            enhancement, the provision and maintenance of surface water drainage,                             landscaping, affordable housing provision, SPA mitigation and adequate                                     infrastructure mitigation.

 

10.6 It is therefore considered that the proposed development complies with 'Saved'                        policies EN1 and EN20 of the BFBLP, Policies CS1, CS2, CS7 and CS8 of the                        CSDPD, Policy SA2 of the SALP, Policy EV1 of the Bracknell Town                                                Neighbourhood Plan, relevant SPDs and the NPPF.  

 

 

11.     RECOMMENDATION

 

FOLLOWING THE PROVISION OF SATISFACTORY INFORMATION TO DEMONSTRATE THAT THE PROPOSED DRAINAGE STRATEGY IS SUITABLE AND          ACHIEVABLE AND THE COMPLETION OF PLANNING OBLIGATION(S)     UNDER      SECTION 106 OF THE TOWN AND COUNTRY PLANNING ACT RELATED TO:  

 

-       Entering into s278 and s38 Agreements with the Highway Authority relating to       works         to Larges Lane to form the site access, lighting improvements and parking layby       as well        as the adoption of the internal access road and footway link to the Cricket Club.

-           Car Club

-           Affordable Housing

-           Community Facility Contribution

-           Contribution towards off-site OSPV

-           SuDS specification/implementation/Management and Maintenance Strategy                              including monitoring contribution

-           SPA Mitigation

-           Funding for Traffic Regulation Order (TRO) alterations on Larges Lane and any              new TRO within the site to control indiscriminate parking and maintain safe access

-           Biodiversity Net Gain monitoring

 

That the Assistant Director: Planning be recommended to APPROVE the       application subject to the following conditions amended, added to or deleted     as the Assistant Director: Planning considers necessary:

 

1.       Approval of the details of landscaping of the development (hereinafter called "the reserved matters") shall be obtained from the Local Planning Authority in writing before       development is commenced. The plans and particulars in relation to the landscaping of        the site shall be submitted in writing to the Local Planning Authority and shall be carried          out as approved.

REASON:  To comply with Section 92 of the Town and Country Planning Act 1990 (as   amended).

 

2.       Application for approval of the reserved matters shall be made to the Local Planning Authority before the expiration of three years from the date of this permission.

REASON:  To comply with Section 92 of the Town and Country Planning Act 1990 (as   amended). 

 

3.       The development hereby permitted shall be begun not later than the expiration of two years from the final approval of the reserved matters, or, in the case of approval on       different dates, the final approval of the last such matter to be approved.

REASON:  To comply with Section 92 of the Town and Country Planning Act 1990 (as   amended).

 

4.       The development hereby permitted shall be carried out only in accordance with the                  following approved plans and documents: -

           

          The development hereby permitted shall be carried out only in accordance                               with the following approved plans and documents:

                   20-J3128-001 Rev.04 ‘Proposed Site Plan’

                   20-J3128-001.01 Rev.04 ‘Proposed Site Plan (Coloured)’

                   20-J3128-002 Rev.04 ‘Parking Layout’

                   20-J3128-003 Rev.02 ‘Building A Floor Plans’

                   20-J3128-004 Rev.02 ‘Building A Elevations’

                   20-J3128-005 ‘Building B Floor Plans’

                   20-J3128-006 ‘Building B Elevations’

                   20-J3128-007 Rev.01 ‘Building C Floor Plans’

                   20-J3128-008 Rev.01 ‘Building C Elevations’

                   20-J3128-009 Rev.02 ‘Street Elevation and Courtyard Sections’

                   20-J3128-010 Rev.02 ‘Massing Comparison Site Plan & Elevations’

                   20-J3128-011 ‘Massing Comparison Site Sections – Sheet 1’

                   20-J3128-012 Rev.01 ‘Massing Comparison Site Sections – Sheet 2’

                   20-J3128-013 ‘Section Through South Boundary’

                   20-J3128-015 Rev.03 ‘Cycle Parking’

                   20-J3128-016 Rev.01 ‘Proposed Amenity’

                   20-J3128-017 ‘Building A North Elevation (Information Plan)’

                   2001043-TN-002 Rev B Proposed EVC and Car Club Parking Allocation                                   Layout

REASON: To ensure that the development is carried out only as approved by the           Local Planning Authority.

 

         

5.       Prior to commencement of any development above slab level, samples of the                 external materials to be used in the buildings hereby approved shall be    submitted to        and approved in writing by the Local Planning Authority. The development shall be     constructed in accordance with the approved materials.

REASON: In the interests of the visual amenities of the area.

[Relevant Policies: BFBLP EN20, Core Strategy DPD CS7]

 

6.       Prior to commencement of any development above slab level, details showing      the finished floor levels of the buildings hereby approved in relation to a fixed datum point        shall be submitted to and approved in writing by the Local     Planning Authority. The         development shall be carried out in accordance with the approved details.

REASON: In the interests of the character of the area.

[Relevant Policies: BFBLP EN20, Core Strategy DPD CS7]

 

7.       No above slab level works, shall take place until a Sustainability Statement covering water efficiency aimed at achieving an average water use in new dwellings of        110 litres/person/day, has been submitted to, and agreed in writing by, the Local       Planning Authority. The development shall be implemented in accordance with the        Sustainability Statement, as approved, and retained and maintained as such thereafter.

REASON: In the interests of sustainability and the efficient use of resources.

[Relevant Policy: Core Strategy DPD CS10]

 

8.       Prior to commencement of above slab level works an Energy Demand Assessment        shall be submitted to and approved in writing by the Local Planning Authority.  This shall    demonstrate:

 

(a)  that before taking account of any on-site renewable energy production the proposed           development will reduce carbon dioxide emissions by at least 10% against the appropriate     Target Emission Rate as set out in Part L of the Building Regulations (2006), and

(b)  that a proportion of the development’s energy requirements will be provided from on-        site renewable energy production (which proportion shall be at least 20%).

 

The buildings thereafter constructed by the carrying out of the development shall be in   accordance with the approved assessment and retained in accordance therewith.

REASON: In the interests of the sustainability and the efficient use of resources.

[Relevant Plans and Policies: CSDPD Policy CS12]

 

9.       No development (including initial site-clearance) shall commence until a detailed   scheme for the protection of existing trees to be retained, in accordance with British    Standard 5837 (2012) 'Trees In Relation To Construction Recommendations' (or any          subsequent revision), has been submitted to and approved in writing by the Local     Planning Authority. Protection measures shall be phased as necessary to take into     account and provide protection during demolition/site clearance works, all construction works and hard landscaping works. Details shall include an approved development         layout plan at a minimum scale of 1:200, showing the following:-

 

a) Accurate trunk positions and canopy spreads of all existing trees within the site and   on adjoining land adjacent to the development within influencing distance of the      development.

b) All proposed tree, hedge or shrub removal shown clearly with a broken line.

c) Proposed location/s of 2.1m high protective barriers, supported by a metal scaffold    framework, constructed as a minimum in accordance with Section 6 (Figure 2), to include appropriate weatherproof tree protection area signage (such as "Keep Out -   Construction Exclusion Zone") securely fixed to the outside of the protective fencing   structure at regular intervals.

d) Illustration/s of the proposed protective barriers to be erected.

e) Proposed location/s and illustration/s of ground protection measures within the main root

protection areas of retained trees, designed as necessary for pedestrian light traffic or   heavy plant machinery, as necessary to prevent contamination and ground compaction.

f) Annotated minimum distances between protective barriers and trunks of retained trees        at regular intervals.

g) All fenced off areas clearly annotated as Tree Protection Areas/Construction Exclusion       Zones.

h) Notes regarding restrictions which apply to Tree Protection Areas/Construction          Exclusion Zones.

The development shall be carried out in full accordance with the approved scheme.

REASON: In order to safeguard trees and other vegetation.

[Relevant Policies: BFBLP EN1 and EN20, CSDPD CS7]

 

10.     The protective fencing and other protection measures specified by condition 9 shall        be erected in the locations agreed in writing by the Local Planning Authority prior to the      commencement of any development works, including any initial clearance, and shall be    maintained fully intact and (in the case of the fencing) upright, in its approved locations        at all times, until the completion of all building operations on the site. Where phased     protection measures have been approved, no works shall commence on the next phase          of the development until the protective fencing barriers and other protective measures           have been repositioned for that phase in full accordance with the approved details. No   activity of any description must occur at any time within these areas including but not         restricted to the following: -

a) No mixing of cement or any other materials.

b) Storage or disposal of any soil, building materials, rubble, machinery, fuel, chemicals,         liquids waste residues or materials/debris of any other description.

c) Siting of any temporary structures of any description including site

office/sales buildings, temporary car parking facilities, porta-loos, storage compounds or         hard standing areas of any other description.

d) Soil/turf stripping, raising/lowering of existing levels, excavation or alterations to the   existing surfaces/ ground conditions of any other description.

e) Installation/siting of any underground services, temporary or otherwise including;       drainage, water, gas, electricity, telephone, television, external lighting or any associated     ducting.

f) Parking/use of tracked or wheeled machinery or vehicles of any description.

 

In addition to the protection measures specified above,

a) No fires shall be lit within 20 metres of the trunks of any trees or the centre line of any         hedgerow shown to be retained.

b) No signs, cables, fixtures or fittings of

any other description shall be attached to any part of any retained tree.

 

REASON: In order to safeguard trees and other vegetation considered to be worthy of   retention in the interests of the visual amenity of the area.

[Relevant Policies: BFBLP EN1 and EN20, CSDPD CS7]

 

11.     No development (other than that required to carry out remediation) shall       commence until the approved remediation scheme has been carried out in full accordance with its terms. The Local Planning Authority shall be given two weeks written        notification of commencement of the remediation scheme works.

 

Following completion of measures identified in the approved remediation scheme, and   before any occupation of the development hereby permitted, a verification report that    demonstrates the effectiveness of the remediation carried out shall be submitted to and     approved in writing by the Local Planning Authority.

REASON: To ensure that risks from land contamination to the future users of the land    and neighbouring land are minimised, together with those to controlled waters, property        and ecological systems, and to ensure that the development can be carried out safely         without unacceptable risks to workers, neighbours and other offsite receptors.

 

12.     In the event that contamination is found at any time when carrying out the    approved development that was not previously identified all on-site works shall cease,          and the Local Planning Authority shall be informed immediately. Any further investigation/remedial/protective works required by the Local Planning Authority shall be    carried out to agreed timescales and approved by the Local Planning Authority in writing        before development recommences. 

 

Following completion of measures identified in the approved remediation scheme a        verification report shall be submitted to and approved in writing by the Local Planning    Authority before the re-commencement of on-site works.

REASON: To ensure that risks from land contamination to the future users of the land    and neighbouring land are minimised, together with those to controlled waters, property        and ecological systems, and to ensure that the development can be carried out safely         without unacceptable risks to workers, neighbours and other offsite receptors.

 

13.              No development (including demolition and site clearance) shall take place,   until a Construction Environmental Management Plan (CEMP) has been submitted to      and approved in writing by the local planning authority.

The CEMP shall include as a minimum:

(i) Location of the access for demolition and construction vehicles;

(ii) Routing of construction traffic (including directional signage and appropriate traffic    management measures);

(iii) Details of the parking of vehicles of site operatives and visitors;

(iv) Areas for loading and unloading of plant and materials;

(v) Areas for the storage of plant and materials used in constructing the development;

(vi) Location of any temporary portacabins and welfare buildings for site operatives;

(vii) Details of any security hoarding;

(viii) Details of any external lighting of the site;

(ix) Details of the method of piling for foundations;

(x) Measures to control the emission of dust, dirt, noise and odour during construction;

(xi) Measures to control rats and other vermin;

(xii) Measures to control surface water run-off during construction;

(xiii) Measures to prevent ground and water pollution from contaminants on-site;

(xiv) construction and demolition working hours and hours during which delivery vehicles        or vehicles taking materials away are allowed to enter or leave the site;

(xv) Details of wheel-washing facilities;

(xvi) Measures to minimise, re-use and re-cycle materials and waste arising from demolition;

(xvii) Measures to minimise the pollution potential of unavoidable waste;

(xviii) Measures to dispose of unavoidable waste in an environmentally acceptable         manner;

(xix) details of measures to mitigate the impact of demolition and construction activities on ecology; and

(xx) Details of a monitoring regime to demonstrate compliance with the CEMP including          timings for reports to be submitted to the Local Planning Authority.

         

The approved Construction Environmental Management Plan shall be adhered to          throughout the demolition and construction period.         

REASON: To mitigate and control environmental effects during the demolition and         construction phases

Relevant Policies: BFBLP EN20, EN25; Core Strategy DPD CS1, CS7

 

14.              No building hereby permitted shall be occupied until a means of vehicular     access to the site has been constructed in accordance with the approved plans.

REASON: In the interests of highway safety.

[Relevant Policies: Core Strategy DPD CS23]

 

15.     No building hereby permitted shall be occupied until a means of access to it for     pedestrians and cyclists has been constructed in accordance with the approved plans.

REASON: In the interests of accessibility and to facilitate access by pedestrians and      cyclists.

[Relevant Policies:  BFBLP M6, Core Strategy DPD CS23]

 

16.     No building hereby permitted shall be occupied until visibility splays of 2.4m x 43m         in each direction at the junction of the access road and Larges Lane have been        provided.  The land within the visibility splays shall be cleared of any obstruction     exceeding 0.6 metres in height measured from the surface of the adjacent carriageway         and shall thereafter be kept free of all obstructions to visibility over a height of 0.6 metres      measured from the surface of the adjacent carriageway.

REASON: In the interests of highway safety.

[Relevant Policies: Core Strategy DPD CS23]

 

17.     No building hereby permitted shall be occupied until 167 car parking spaces have          been laid out within the site in accordance with plan reference 20-J3128-002 Rev 04   PARKING LAYOUT. The spaces and turning space shall thereafter be kept available for       parking and turning at all times.
          REASON: To ensure that the development is provided with adequate car parking to       prevent the likelihood of on-street car parking which would be a danger to other road      users.
          [Relevant Policies: BFBLP M9, Core Strategy DPD CS23]

 

18.     No dwelling shall be occupied until the associated electric vehicle charging infrastructure with a minimum output of 7kW per charge point has been provided in   accordance with plan reference 20-J3128-002 Rev 04 PARKING LAYOUT and       thereafter the electric vehicle charging infrastructure shall be retained and maintained in    working order.

REASON: In the interests of sustainable development and modes of travel.

[Relevant Policies: BFBLP M9, Core Strategy DPD CS1 and CS23]

 

19.     There shall be no restrictions on the use of the car parking spaces shown on the   approved plan for the occupiers of, or visitors to, the building hereby permitted (other          than those parking bays marked as disabled or as EV charging bays which may be    restricted for use by people with disabilities or electric vehicle owners respectively).

REASON: To ensure that the development is provided with adequate parking in the       interests of highway safety.

[Relevant Policies:  BFBLP M9, Core Strategy DPD CS23]

 

20.     The development shall not be occupied until 250 secure and covered cycle parking        spaces for residents and 28 cycle parking spaces for visitors have been provided in          accordance with details that have been submitted to and approved in writing by the Local         Planning Authority, and in the locations identified for cycle parking on the approved plans      within the development. The cycle parking facilities shall thereafter be retained.

REASON: In the interests of accessibility of the development to cyclists.

[Relevant Policies: BFBLP M9, Core Strategy DPD CS23]

 

21.     No gates shall be provided at the vehicular accesses to the site.

REASON: In the interests of highway safety.

[Relevant Policies: Core Strategy DPD CS23]

 

22.     No building hereby permitted shall be occupied until the following off-site highway          works have been completed:

 

The formation of the access to the site and the closure of the access to the cricket club.

Alterations to Larges Lane to form a layby to relocate on street parking opposite the site          entrance.

Improved street lighting along the footway adjacent to the site on Larges Lane from the site to its junction with A329 London Road

REASON: In the interests of highway safety.

[Relevant Policies: BFBLP M4, Core Strategy CS24]

 

23.     No development shall take place until the applicant or their agents or successors in        title have secured the implementation of a programme of archaeological work in          accordance with a written scheme of investigation, which has been submitted by the           applicant and approved by the Local Planning Authority. The programme of     archaeological work shall provide for:

a) a programme of exploratory archaeological evaluation prior to the commencement of           development

b) further archaeological investigation prior to the commencement of development of any        areas of archaeological interest identified by the exploratory archaeological evaluation

c) post-investigation analysis reporting and publication commensurate with the      significance of the archaeological results.

 

This part of the condition may not be discharged until the full programme of archaeological work has been satisfactorily completed. The development shall only take place in accordance with the detailed scheme approved pursuant to this condition.

REASON:The site lies within an area of high archaeological potential. The            condition    will ensure that any archaeological remains within the site are adequately investigated and recorded in order to advance our understanding of the significance of      any buried remains to be lost and in the interest of protecting the archaeological heritage     of the Borough.

 

24.     No development shall take place until Community Use Agreements prepared in    consultation with Sport England have been submitted to and approved in writing by the   Local Planning Authority, and a copy of the completed approved agreements have been    provided to the Local Planning Authority.  The agreements shall apply to the enhanced facilities for football detailed in the submitted document Bracknell Town FC & Sandhurst Town FC – an overview of our position by the SB Group and shall include details of           pricing policy, hours of use, access by community users, management responsibilities   and a mechanism for review.  The Community Use Agreements shall be retained, and    access provided to the facilities in strict compliance with the approved agreements.

Reason: To secure well managed safe community access to the sports facility/facilities,          to ensure sufficient benefit to the development of sport and to accord with Development       Plan Policy.

 

25.     No development shall take place until evidence has been submitted and agreed in         writing by the Local Planning Authority that all the works permitted at the Sandhurst     Town FC site at Sandhurst Memorial Park, Yorktown Road, Sandhurst under application      19/01085/FUL have been legally and fully completed in accordance with the approved     plans.

Reason: To ensure sufficient benefit to the development of sport and to accord with       Development Plan Policy.

 

26.     The development hereby permitted shall secure Biodiversity Net Gain in line with,          or better than, the submitted Biodiversity Net Gain Assessment Report prepared by   Applied Ecology (AEL1756_v1.0_20210705).

REASON: In the interests of nature conservation
          [Relevant Plans and Policies: Core Strategy DPD CS1, CS7]

 

27.     The development hereby permitted shall not be occupied until biodiversity         enhancements including swift boxes and other features for wildlife around the site have been   provided in accordance with a Biodiversity Enhancement Plan that has been submitted to    and approved by the Local Planning Authority.

REASON: In the interests of nature conservation
          [Relevant Plans and Policies: Core Strategy DPD CS1, CS7]

 

28.     No part of the development shall be occupied until details of a refuse management        plan have been submitted to and approved in writing by the Local Planning Authority. The development shall thereafter be operated in accordance with the approved details.

REASON: To ensure the provision of satisfactory waste storage facilities in the     interests of amenity. [Relevant Policy: Relevant Policy: Core Strategy DPD CS13]

 

29.     Development of Block A shall not commence until details of the footpath to the      north of the block have been submitted to and approved in writing by the Local Planning          Authority. The submitted details should include full details of the construction of this          pedestrian route including retaining walls or other structures and levels along its length,      together with connections with adjoining pedestrian routes within and beyond the site in order to ensure that this route provides an accessible pedestrian link to the cricket club.

REASON: To achieve accessibility and in the interests of the amenities of the area.

 

Informative:

 

01.     Notwithstanding the wording of Bracknell Forest Council’s Parking Standards SPD,        the Building Regulations part S “Infrastructure for the charging of electric vehicles”               2021 edition takes effect on 15 June 2022 for use in England. It does not apply to             work subject to a building notice, full plans applications or initial notices submitted             before that date, provided the work is started on site before 15 June 2023. The                        applicant should familiarise themselves with, and comply with, the requirements of            this document with regard to provision of electric vehicle charging infrastructure.  

 

 

In the event of the S106 agreement not being completed by 24th June 2022,   the    Assistant Director: Planning be authorised to either extend the period further or refuse the application for the following reason: -

 

01        In the absence of a planning obligation to secure suitable avoidance and mitigation        measures and access management monitoring arrangements, in terms that are   satisfactory to the Local Planning Authority, the proposal would be contrary to Regulation      63(5) of the Conservation of Habitats and Species Regulations 2017 (as amended),    Policy NRM6 of the South East Plan, Policy EN3 of the Bracknell Forest Borough Local     Plan, Policy CS14 of the Core Strategy Development Plan Document and the Thames           Basin Heaths Special Protection Area Supplementary Planning Document (2018).